A lighting assessment is a report that shows a council what external lighting you plan to install and proves it will not cause unacceptable light pollution. It is sometimes called a lighting impact assessment, external lighting scheme or lighting strategy. Councils ask for one either when you submit a planning application or later, to discharge a planning condition about external lighting.
The aim is simple: show that the site has enough light to be safe and usable, without spilling light onto neighbours, wildlife habitats or the night sky.
Why do councils ask for a lighting assessment?
Artificial light is a planning matter. National planning policy asks councils to limit the impact of light pollution on local amenity, intrinsically dark landscapes and nature conservation. In England this is set out in chapter 15 of the National Planning Policy Framework and the government's Planning Practice Guidance on light pollution. Wales, Scotland and Northern Ireland have their own equivalent policies.
Most councils turn this into a local validation requirement. Typical triggers are major developments, floodlighting, sites near homes, and sites near bats or protected landscapes. Our guide on when a lighting assessment is required covers this in detail.
What does a lighting assessment include?
A good lighting assessment answers the questions a planning officer, environmental health officer or ecologist will ask. It normally includes:
- A description of the site and its surroundings: neighbouring homes, roads, trees, hedgerows, watercourses and any protected landscape.
- The environmental zone the site falls into under ILP Guidance Note 01/21, from E0 (protected dark sky areas) to E4 (busy urban centres). This sets the limits the scheme must meet. See our guide to obtrusive light and environmental zones.
- A lighting layout showing every fitting, its mounting height, tilt and aiming direction.
- A luminaire schedule with the make, model, light output, colour temperature and any shields or louvres.
- A lux contour plan showing light levels across the site and how quickly they fall to near zero at the boundary.
- Obtrusive light calculations: upward light, light falling on neighbours' windows, and glare towards people and road users.
- Hours of use and controls: timers, dusk-to-dawn sensors, motion sensors, dimming and a curfew time.
- Ecology measures where bats or other wildlife are present, following ILP Guidance Note 08/23.
- A conclusion stating whether the scheme meets the relevant guidance and policy.
Get an instant fixed price using LuxQuotesAnswer a few questions and see your fixed price in about a minute.
Get my fixed priceHow long does it take?
Once we have your drawings, our standard turnaround is 7 working days, or 3 working days with express. Most of the time goes into modelling the scheme in lighting design software and checking it against the limits for your environmental zone.
What happens if I don't provide one?
If your council's validation list asks for a lighting assessment and you don't include one, your application can be declared invalid and won't be registered. If lighting is only mentioned later, you may get an approval with a condition saying no external lighting can be installed until details have been approved. That means another submission, more fees and more waiting before you can light the site. Doing it properly at the start usually saves time.
Getting a lighting assessment with LuxQuotes
We price lighting assessments on your plot size and site type, so you can see a fixed price straight away. Every report is designed and signed off by a Chartered Engineer registered with the Institution of Lighting Professionals. Get an instant fixed price using LuxQuotes.
Frequently asked questions
Is a lighting assessment the same as a lighting impact assessment?
They are often used to mean the same thing. A lighting impact assessment usually goes further and looks at the effect on the wider landscape, views and wildlife, and is common for larger or more sensitive schemes. Our guide on the different lighting documents explains the differences.
Who can prepare a lighting assessment?
Councils expect it to be prepared by a suitably qualified and competent person. That normally means a lighting designer or engineer with professional membership, such as the Institution of Lighting Professionals (ILP) or a chartered engineering institution.
Can I just send the manufacturer's lighting plan?
Sometimes, for very simple sites. But manufacturer layouts usually show light on the ground only. They rarely check light spill at the boundary, light into neighbours' windows, upward light or bat habitats, which is what planning officers and ecologists look for.